Support: +91-22-61011756 / help@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Ayodhya station in Uttar Pradesh to be revamped

Wednesday, 05 Aug 2020
Share this on :
Indian Railways' Ayodhya railway station in Uttar Pradesh is all set to get a makeover. The Ayodhya railway station, which falls under the Northern Railway zone, is currently being modelled on the Ram temple.

Under Phase-I of the Ayodhya railway station development project, a grand station building with a contemporary façade will be developed.

Since the city of Ayodhya is one of the most important religious places in the country, Indian Railways will provide direct connectivity from Lucknow, Varanasi as well as other religious places in the nearby areas.

In the coming future, the Ayodhya Circuit is likely to be the country’s biggest tourist hub. The Phase-I of the station development project is being executed at a cost of Rs 104 crore.

The Phase-I is expected to be complete by June 2021. The built-up area will be 1,00,000 sq ft with all modern facilities. The platforms and aprons will be upgraded. The circulating area will also be revamped. Additionally, staff quarters will be set up.

As many as 15 ticket counters to be set up with CRS and CBS office. At the station’s first floor, there will be first class, second class, general and ladies waiting area.

Three AC retiring rooms will be set up as well as gents dormitory with 17 beds and ladies dormitory with 10 beds, The station will have two foot over bridges (FOBs). At the station’s ground floor, one food plaza and four shops, and on the first floor, one food plaza will be set up.

Under the planning of Phase-II of the station development project, the entry and exit from the western link road will be modified.

The circulating area and station building on the second entry will be developed. Also, on frontage, an additional holding area of 18,000 sq mtr will be developed.
Meanwhile, additional land has been demanded for infrastructure development including two washing lines, two sick lines, four additional platforms, on 1,50,00,00 sq ft area.

Some of the other major sanctioned works include construction of ROB at L-Xing 121, yard remodelling of Faizabad yard, construction of freight terminal at Salarpur, development of coal siding at Bhilarghat, electrification of Barabanki-Akbarpur section and doubling between Barabanki-Ayodhya-Zafrabad section.

 
Post Your Comments
 
 
   
 

 

 
  
Sign up to start your free trial

Are you...



REGISTER AND GET STARTER KIT ABSOLUTELY FREE!

Free access to Project News and Analysis

Project and Tender Alert in your mailbox

Explore the largest Database on Projects for free

Be part of Online Projects Community

User login
Start Exploring

Subscribe to any of our premium plans to

Access to complete information on 43000+ projects

Use our Notification service for instant update on projects and tenders

Closely monitor your opportunities with "WORKSPACE"

Use our online platform for promotions of your products and services