Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

BMC begins work on Goregaon stretch of Coastal Road

Thursday, 10 Jul 2025
Share this on :

The Brihanmumbai Municipal Corporation (BMC) has commenced the foundation work on a 1.2-km stretch of the Coastal Road Project in Goregaon, which lies outside the Coastal Regulation Zone (CRZ) limits.

This segment forms part of Package B, covering a total length of 1.66 km between Bangur Nagar and Mindspace (Malad), and is a critical part of the second phase of the Coastal Road Project. The north phase of the project is designed to link Versova in the western suburbs to Bhayandar, encompassing elevated roads, interchanges, and twin tunnels.

On 09 July, 2025, Additional Municipal Commissioner (Projects) Abhijit Bangar conducted a site inspection to review the progress and instructed officials to strictly avoid initiating work in CRZ-designated areas. He also visited multiple other project sites, including Versova, Andheri, the Lokhandwala interchange, and Malad Mindspace, to assess progress across various components of the mega infrastructure initiative. The Coastal Road is being constructed in six packages between Versova and Dahisar, with a substantial portion traversing both land and creeks under CRZ jurisdiction.

New Password
Confirm Password