Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Bids invited for six laning of NH-2 in Bihar and Jharkhand

Saturday, 29 Oct 2016
Share this on :

National Highways Authority of India (NHAI) has invited bids for six laning of NH-2 in Bihar and Jharkhand.

The scope of work for the three projects are:

1. Six laning of Aurangabad to Bihar/Jharkhand border (Chordaha) section of NH-2 from 180.000 km to 249.525 km in the state of Bihar, under NHDP Phase-V (Package-I), through hybrid annuity mode (HAM). The estimated cost of the project is Rs 835.26 crore.

2. Six laning of Bihar-Jharkhand border (Chordaha) to Gorhar section of NH-2 from 249.525 km to 320.810 km in the state of Jharkhand, under NHDP Phase-V, on hybrid annuity mode (HAM) (Package-II). The estimated cost of the project is Rs 1,071.51 crore.

3. Six laning of Gorhar to Barwa Adda section of NH-2 from 320.810 km to 400.132 km in the state of Jharkhand, under NHDP Phase-V, (Package-III), on hybrid annuity mode (HAM). The estimated cost of the project is Rs 1,303.2 crore.

New Password
Confirm Password