Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

CIMIC Group firms Sedgman and Leighton Asia bag contracts to set up zinc tailings recycling facility

Thursday, 29 Jan 2026
Share this on :

CIMIC Group firms Sedgman and Leighton Asia has bagged contracts for setting up India’s first zinc tailings recycling facility at its Rampura Agucha Mines in Rajasthan.

Hindustan Zinc has awarded the engineering, procurement, and construction (EPC) contracts, wherein Sedgman will oversee detailed engineering and offshore equipment procurement, while Leighton Asia will handle onshore procurement and construction. The collaboration combines global minerals processing expertise with local infrastructure execution capabilities. The facility will employ advanced processing technologies to recover residual metals like zinc and silver from previously processed tailings, transforming legacy waste into valuable resources.

The project is part of Hindustan Zinc’s plan to double its production capacity. in August, the Board approved an investment of up to Rs 3,823 crore for a 10 MTPA zinc tailings recycling plant at Rampura Agucha, set for completion within 28 months.

New Password
Confirm Password