Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Chandigarh’s first flyover by June 2020

Monday, 25 Feb 2019
Share this on :
The Chandigarh Administration has begun the process for construction of the city’s first flyover, following an approval for the revised detailed project report (DPR) for the project.

The 1.6 km flyover will be developed at the cost Rs 184 crore to be borne by the Centre. The flyover will be completed by June 2020.

Moreover, the shift stormwater, sewer and water pipelines along Dakshin Marg, which will cost around Rs 32 crore, will be shifted. The tenders will be floated on 26 February 2019 and the work will take around three months.

The flyover project was approved in 2016. In December 2017, STUP Consultants prepared a detailed project report, proposing 6.5 km flyover, beginning in Zirakpur.

However, in July 2018, the length of the flyover was reduced from 6.5 km to 1.6 km and the cost from Rs 390 crore to Rs 184 crore.

New Password
Confirm Password