Dilip Buildcon (DBL) has emerged as the lowest (L1) bidder for a new OB Removal Contract Mining work for Nigahi Project at Singrauli district in Madhya Pradesh.
The value of the contract is Rs 2,122.73 crore (including GST). The company has secured the contract from the Northern Coalfield (NCL), a subsidiary of Coal India (CIL).
The work includes excavation of overburden of first dig (solid) by mechanical means such as excavators, dumpers/ tippers, drills, dozers, graders and water sprinklers for composite work consisting of blast hole drilling, excavation, loading, transportation of broken rocks/ soil/ earth, unloading/dumping, spreading, dozing, water sprinkling and grading, etc as per instructions of Engineer-in-charge at specified places at Nigahi OCP of NCL.