Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Diamond Power secures Rs 748-cr cables supply contract from Adani Green Energy

Friday, 05 Dec 2025
Share this on :

Diamond Power Infrastructure has received a letter of intent (LoI) from Adani Green Energy for the supply of cables for projects in Khavda and Rajasthan.

The total value of the contract stands at Rs 747.64 crore. The order is for the supply of 33KV HV cables totalling 2,126 km and 3.3KV solar MV cables spanning 3,539 km has been awarded on a kilometer rate basis with PV formulas, ensuring flexibility and performance-based execution. The contract period is set from January 2026 to December 2026, during which Diamond Power Infrastructure will be responsible for manufacturing, supplying, and delivering the cables in line with project timelines and technical specifications.

This order strengthens the company’s presence in the renewable energy sector, particularly in solar infrastructure, and highlights its capabilities in handling large-scale electrical cable supply projects. The collaboration with Adani Green Energy underscores its quality, reliability, and capacity to meet critical energy transmission requirements for major renewable energy projects.

New Password
Confirm Password