Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Dilip Buildcon-HCC JV emerges L1 bidder for EPC project

Tuesday, 14 Jul 2020
Share this on :

Dilip Buildcon-HCC JV has emerged as the lowest (L1) bidder for EPC project worth Rs 1,900.08 crore in the state of Bihar.

The scope of work envisages construction of new link NH-133B from 0.200 km (200.700 km of Sahibganj bypass) in Jharkhand to 15.885 km (25.240 km of NH-131A) including Ganga bridge, and construction of Manihari bypass from 0.000 km (25.240 km of NH-131A) to 5.500 km (34.100 km of NH-131A near Narenpur) and widening of NH-131A from 5.500 km (34.100 km of NH-131A)  to 6.000 km (34.600 km of NH-131A) to four-lane standards.

The completion period of the project with a length of 21.685 km is 48 months.

 

New Password
Confirm Password