Dilip Buildcon has been declared the lowest bidder (L1) for a hybrid annuity (HAM) project.
The scope of work involves four-laning of NH-363 from Repallewada (design 42.000 km/existing 288.510 km) to Telangana/Maharashtra Border (Design 94.602 km/existing 342.000 km) (design length - 52.602 km) in Telangana under NH (O).
The cost of the project is Rs 1,140.50 crore with a completion period of 24 months and operation period of 15 years from COD. The cost of first year operation and maintenance is Rs three crore.