Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Dilip Buildcon declared L1 bidder for HAM project

Tuesday, 04 Aug 2020
Share this on :

Dilip Buildcon has been declared the lowest bidder (L1) for a hybrid annuity (HAM) project.

The scope of work involves four-laning of NH-363 from Repallewada (design  42.000 km/existing 288.510 km) to Telangana/Maharashtra Border (Design  94.602 km/existing 342.000 km) (design length - 52.602 km) in Telangana under NH (O).

The cost of the project is Rs 1,140.50 crore with a completion period of 24 months and operation period of 15 years from COD. The cost of first year operation and maintenance is Rs three crore.

 

New Password
Confirm Password