Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Dilip Buildcon receives LoA for EPC twin-tube tunnel project in Kerala

Friday, 20 Jun 2025
Share this on :

Dilip Buildcon (DBL) has announced the receipt of a letter of acceptance (LoA) for a road infrastructure contract in Kerala, marking another milestone in its growing national portfolio. The project involves the construction of a twin-tube unidirectional tunnel with two lanes in each traffic direction, along with a four-lane approach road, providing direct connectivity between Anakkampoyil–Kalladi–Meppadi in the Kozhikode and Wayanad districts.

Awarded on an engineering, procurement & construction (EPC) basis, the stretch spans from km 0.460 to km 8.735, covering a total length of 8.275 km (Package-II). The total order value is Rs 1,341 crore (including GST). The project aims to enhance regional connectivity and reduce travel time between key areas, contributing to economic and logistical development in Kerala’s hilly terrain.

Known for its engineering prowess in complex infrastructure projects, DBL’s involvement is expected to ensure timely and quality delivery. The execution timeline for the project is 48 months, from the date of commencement. This contract reinforces Dilip Buildcon’s reputation as a leader in executing large-scale infrastructure projects across India.

New Password
Confirm Password