Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Dilip Buildcon receives completion certificate for Navnera Barrage under ERCP

Monday, 03 Feb 2025
Share this on :

Dilip Buildcon has successfully completed the engineering, procurement, and construction (EPC) project for the Navnera Barrage (Dam) under Phase-I/(A) of the Eastern Rajasthan Canal Project (ERCP). 

The project, undertaken on a single-responsibility turnkey basis, involved survey, planning, design, and construction, including hydro-mechanical works across the Kalisindh River near Abra village, Digod Tehsil in Kota, Rajasthan. The physical completion of the project was achieved on 30 September 2024, followed by the issuance of the completion certificate by the Water Resources Department, on 17 January 2025, which was received on 01 February, 2025.

The revised project cost stands at Rs 661.95 crore, with a construction period of 48 months. This milestone signifies a development in water resource management under the ERCP, enhancing irrigation and water supply in the region.

New Password
Confirm Password