Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Final DPR submitted for Dawki road project

Tuesday, 10 Oct 2017
Share this on :
The final detailed project report for the improvement of NH-40 between Shillong and Dawki, and construction of Dawki bridge funded by JICA funding, has been submitted.

As per the status report of the National Highways and Infrastructure Development Corporation, the final report was submitted in August 2017.

The report also added that the road alignment has been modified following a proposal from JICA and the state government. The 71.2 km road project will entail an investment of Rs 1,330 crore.

The project will take two and a half years to be complete after the tender has been issued. The work will include a 368 mtr long and 12.5mtr wide bridge in Dawki.

The project proposes to build a four lane road from Umshyrpi to Mylliem and a two lane road connecting Dawki and Tamabil.

Transys Consulting has been appointed as the project consultant.

New Password
Confirm Password