Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Foundation stone laid for widening of Hyderabad-Vijayawada highway

Monday, 22 Mar 2010
Share this on :

On 21 March 2010, R P N Singh, Union Minister of State for Road Transport and Highways, laid foundation stone for the four/six laning of the Hyderabad-Vijayawada section of NH 9 at Narketpally in Andhra Pradesh.

The project is estimated to cost Rs 1,740 crore. Under the project, six bypasses have been planned, through Narketpally, Nakrekal, Kodada, Akupamula, Sher Mohammed Peta and Navabpet.

In addition, two wayside amenities for travelers are to be provided. The expansion is likely to be completed by June 2013.

A major section of the highway passes through the Nalgonda district which is likely to benefit the local people by providing quicker access to Hyderabad. Also, the expansion is likely to reduce vehicle operating costs and bring down travel time between Hyderabad and Vijayawada, from six hours to four hours.

Also See:

GMR raises debt for Hyderabad-Vijayawada highway (24-Feb-10)

Related Links:
Project profile

New Password
Confirm Password