Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

GMR Group bags Holi Bajoli Hydro Electric Project

Saturday, 30 Jun 2007
Share this on :

The GMR Energy has bagged the 180 MW Holi Bajoli Hydro Electric Project proposed to be set up across the river Ravi in Himachal Pradesh. The Rs.1,050 crore project is a run of the river project in Chamba district.

Reliance Energy, Jaiprakash Hydropower Ltd, Lanco, Moser-Baer India, Torrent-Gammon Consortium, and Larsen and Toubro were the other bidders. In all, 18 bidders submitted the request for qualification, floated by the HP State Electricity Board.

Himachal Pradesh would be allotted free power from the project to the extent of 12 per cent of the generation for the first 12 years as per the term. The other beneficiary states include Haryana, Punjab and Delhi.

GMR will bring in Rs.210 crore as equity while the remaining Rs.840 crore will be sourced through debt financing.

The project is expected to go into commercial operations by 2014.

GMR Energy set to bag Holi Bajoli HEP in Himachal (29-Jun-07)

New Password
Confirm Password