Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Galfar Engineering declared L1-bidder for Patna-Arrah-Sasaram Corridor

Thursday, 29 May 2025
Share this on :

Galfar Engineering & Contracting SAOG, an Oman-based engineering and contracting firm, has been declared as the lowest bidder (L1) with a value of Rs 993 crore by NHAI for construction of Patna-Arrah-Sasaram Corridor (NH-119A) under Package-2 on hybrid annuity mode (HAM) in Bihar.

The project comprises four-lanning from Garhani at ch 73.700 km to Patar at ch 84.300 km (Section-1) and construction of greenfield corridor from Sadisopur at Patna Ring Road (NH-131G) ch 0.000 km to Asani (NH-319) ch 35.800 km (Section-2).

The work includes construction of new pavement, rehabilitation of existing pavement, construction and/ or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains etc.

The length of the corridor under the package is 46.400 km.

New Password
Confirm Password