Galfar Engineering & Contracting SAOG, an Oman-based engineering and contracting firm, has been declared as the lowest bidder (L1) with a value of Rs 993 crore by NHAI for construction of Patna-Arrah-Sasaram Corridor (NH-119A) under Package-2 on hybrid annuity mode (HAM) in Bihar.
The project comprises four-lanning from Garhani at ch 73.700 km to Patar at ch 84.300 km (Section-1) and construction of greenfield corridor from Sadisopur at Patna Ring Road (NH-131G) ch 0.000 km to Asani (NH-319) ch 35.800 km (Section-2).
The work includes construction of new pavement, rehabilitation of existing pavement, construction and/ or rehabilitation of major and minor bridges, culverts, road intersections, interchanges, drains etc.
The length of the corridor under the package is 46.400 km.