Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Great Eastern Energy commissions CBM pipeline in Bengal

Thursday, 29 Jan 2009
Share this on :

Great Eastern Energy Corporation (GEECL), the Delhi based company has commissioned a natural gas pipeline based on coal bed methane (CBM) in West Bengal. The company has invested around Rs.350 crore till date in the first phase of the project

The 11.8 km CBM gas pipeline today connected its gas generation centre located at Shymadih to its central gas gathering station at Asansol in the Asansol Durgapur Development Authority (ADDA) industrial area, 210 km west of Kolkata.

GEECL was drawing CBM from 23 wells linked to coal beds and aims to tap 100 wells in another two years and 300-400 wells in three years time.

The 12 km stretch of the CBM pipeline, from Asansol to Kulti, was 99 per cent complete and will be operational by February, while the third network link from Asansol to Durgapur will be operational in six months.

Related Links:
Project profile

New Password
Confirm Password