Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

IL&FS Engineering Services receives final settlement from NHAI for two road projects

Tuesday, 11 Jun 2019
Share this on :
IL&FS Engineering and Construction Company (IL&FS Engineering Services) has entered into a settlement agreement with the National Highways Authority of India (NHAI) against the arbitration award for two road projects through conciliation.

These include widening and strengthening of the existing national highway from two- lane to four-lane from 36.00 km to 5.50 km of Daboka to Nagaon section of NH-36 in Assam on East-West Corridor under Phase-II Programme of NHDP contract package no EW-II (AS-17). The claim amount received is Rs 41.82 crore.

Widening and strengthening of the existing NH from two-lane to four-lane from 230.50 km to 205.00 km of Dharamtul to Sonapur section of NH-37 in Assam on East-West Corridor under Phase-II Programme of NHDP contract package no EW-II (AS-19). The claim amount received is Rs 108.33 crore.

New Password
Confirm Password