Support: +91-22-61011756 / help@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Irrigation & CAD Department, Andhra Pradesh floats tenders

Tuesday, 20 Aug 2019
Share this on :
Irrigation & CAD Department, Andhra Pradesh has floated tenders for balance works of Polavaram irrigation project.

The work on the irrigation project will be carried out in two parts with a completion period of 24 months.

Part-A envisages balance works of investigation, survey, preparation of designs and drawings and LP schedules etc.

1) Construction of earth dam Gaps-I & III, earth-cum-rock fill dam for Gap-II, spill channel, approach channel and pilot channel,

2) Construction of spillway with crest level+25.72 mtr and its ancillary works and

3) Excavation of foundations of 960 MW hydro electric power house, approach channel, intake structure, tail race pool, tail race channel etc of Polavaram irrigation project.

The work undertaken in Part-A has O&M for five years including defect liability period of two years (LS contract system). The entire work will be carried out at an investment of Rs 1,771.44 crore.

Part-B envisages design, engineering, manufacturing, testing at manufactures works before dispatch, supply, transportation, storage at site, insurance, erection, testing and commissioning of 12 nos each 80 MW capacity vertical full, Kaplan turbine generator units along with all associated auxiliary and ancillary equipment.

It also involves setting up of 400 kV gas insulated switchgear and civil works of power house, pressure tunnels, approach channel, intake pool, intake structure, tail race pool (TRP), tail race channel (TRC) and other civil works etc and hydro mechanical works (gates, hoists and trash rack etc) of Polavaram hydro electric project. The work will be completed at a cost of Rs 3,216.11 crore.

 
Post Your Comments
 
 
   
 

 

 
  
Sign up to start your free trial
REGISTER AND GET STARTER KIT ABSOLUTELY FREE!

Free access to Project News and Analysis

Project and Tender Alert in your mailbox

Explore the largest Database on Projects for free

Be part of Online Projects Community

Username:

Start Exploring

Subscribe to any of our premium plans to

Access to complete information on 43000+ projects

Use our Notification service for instant update on projects and tenders

Closely monitor your opportunities with "WORKSPACE"

Use our online platform for promotions of your products and services