Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

JNPT Port road project receives approval from CCEA

Wednesday, 25 Sep 2013
Share this on :

Jawaharlal Nehru Port Trust (JNPT) port road project of the Mumbai JNPT Port Road Company has received approval from the Cabinet Committee on Economic Affairs (CCEA).


The project is estimated to cost Rs 1,943.37 crore including the cost of land acquisition, resettlement and rehabilitation and other pre-construction activities. The project has received approval for 6/8 laning of port road, on Build, Operate and Transfer (BOT-Annuity) in Design, Build, Finance, Operate and Transfer (DBFOT) pattern.


The total length of the road will be approximately 43.912 km, of which 20.95 km will be of six laning and 22.962 km will be of eight laning.

 

Related Link:
Project profile

New Password
Confirm Password