The Kakrapar Atomic Power Plant-3 located in Surat, Gujarat, has achieved criticality.
The 700 MWe KAPP-3 reactor in Gujarat has achieved criticality, meaning it reached normal operating condition of a reactor. It indicates that the plant is now set to generate power.