Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

L&T Hydrocarbon Engineering bags order from Saudi Aramco

Thursday, 05 Apr 2018
Share this on :
L&T Hydrocarbon Engineering (LTHE), a wholly-owned subsidiary of Larsen & Toubro (L&T), has bagged three gas production deck modules from Saudi Aramco.

The scope of work envisages engineering, procurement, fabrication, transportation, installation and commissioning of three gas production decks with a high integrity protection systems and exotic materials.

Two of the decks will be installed in Hasbah and one in Arabiyah field of Saudi Aramco.

New Password
Confirm Password