Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

L&T, TIDCO signs JV for integrated shipyard complex

Tuesday, 15 Apr 2008
Share this on :

On 15 April 2008, Larsen & Toubro signed a joint venture agreement with Tamil Nadu Industrial Development Corporation (TIDCO) to set up an integrated shipyard complex along with a port facility at Kattupalli village, near Ennore in Tiruvallur district. The project will entail an investment of about Rs.3,000 crore.

The feasibility report for the project has been completed and necessary environment studies are under progress. The shipyard complex will include facilities for commercial ship building including very large cargo carriers, specialized cargo ships for liquid / gas transportation and cruise vessels. It will also have the capability to build vessels for the defence sector, off-shore platforms & floating production cum storage facilities for the oil and  gas sector.

The shipyard will also have the facilities for refitting and re-engineering of commercial and defence vessels, and heavy engineering fabrication and components production for ship building purposes. Construction work on the proposed project will start by the end-2008 and will be completed in 24 months.

Also See:

Construction work on L&T's integrated shipybuilding yard to begin soon (21-Mar-08)

New Password
Confirm Password