Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

L&T bags Rs.877 crore order from ONGC

Tuesday, 12 Jun 2007
Share this on :

Larsen & Toubro bagged a turnkey order worth Rs.877 crore from Oil & Natural Gas Corporation (ONGC) for the NQ Re-construction (NQRC) Project in Mumbai High North fields.

The project comprises of re-construction of offshore facilities at the NQ Complex including the replacement of the existing booster compressor with a new process gas compressor module, revamp of produced water conditioning system, hot oil system, gas dehydration unit and other utilities.

The turbo-machinery for the process gas compressor module will be supplied by Kawasaki Heavy Industries (KHI), Japan and the module will be fabricated and delivered from the Company's Modular Fabrication Facility at Hazira.

The order will be executed on a lump sum turnkey basis with the completion scheduled by 8 May 2009.

New Password
Confirm Password