Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Lara thermal power project to start soon

Tuesday, 29 Sep 2015
Share this on :
NTPC’s 4,000 MW Lara thermal power project will go on stream by March 2017 with the commissioning of its first 800 MW unit. The project set up in Chhattisgarh will require an investment of about Rs 30,000 crore.

The project is based on super critical technology and coal from Talaipalli mine will be supplied to the Lara Super Thermal Power Project as per the MoU signed between NTPC and the government of Chhattisgarh.

Power generated from the Lara project will be supplied to Chhattisgarh, Maharashtra and Goa.

More Project Info:Lara Integrated Thermal Power Project

New Password
Confirm Password