MKC Infrastructure has been declared the lowest (L1) bidder by the National Highways Authority of India (NHAI) for two road sections of Delhi-Vadodara Greenfield Alignment.
The scope of work includes construction of eight-lane access-controlled expressway starting from Junction with NH-47 near Bhamaiya village and ending at Junction with SH-175 in Baletiya Village in Panchmahal district (ch 780.920 to 803.420; design ch 328.500 to ch 351.000) section of Delhi-Vadodara Greenfield Alignment (NH-148N) in the state of Gujarat on EPC mode under Bharatmala Pariyojana. (Package- 29).
It also includes construction of eight-lane access-controlled expressway starting from Junction with SH-63 near Pratap Nagar village and ending at Junction with NE-1 near Dodka village of Vadodara district (ch 824.920 to ch 844.382 and design ch 372.500 to ch 391.962) section of Delhi-Vadodara Greenfield Alignment (NH-148N) (Package No- 31).