Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

MMRDA sets deadline for ISBT bidders

Wednesday, 28 Apr 2010
Share this on :

The MMRDA has reportedly set 21 May 2010 as a deadline for the potential bidders to submit their RFPs for the state-of-the-art Inter State Bus Terminal (ISBT) project. The project is estimated to cost Rs 350 crore.

The ISBT is to come up on a 4.5 ha plot situated next to the Wadala truck terminus. It is likely to have world-class passenger platforms, food courts, cinema halls, departmental stores, budget hotel, convenience rooms, rest rooms, recreation centres and baggage rooms. It is expected to provide integrated facilities for BEST/Auto/Taxi and cars/two wheelers parking. A monorail station is under implementation to provide direct connectivity to ISBT.

The entire project will be undertaken, completed and operated on PPP basis wherein the terminal is expected to be leased out to the developer for a lease period of 25 years. The private developer will design, built, finance and operate the terminal and commercial activities at the premises.

The developer will have to construct mechanical workshops, vehicle washing facilities and rest rooms for the transport operators apart from providing systematic bus parking facility. The proposed ISBT is expected to be operational by December 2013.

Also See:

MMRDA plans twin tunnel (24-April-10)

Related Links:
Project profile

New Password
Confirm Password