Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Maharashtra highway project: IRB Infra as lowest bidder

Thursday, 25 Jun 2009
Share this on :

IRB Infrastructure Developers has reportedly surfaced as the lowest bidder for a NHAI project in Maharashtra.

The project estimated to cost Rs 800 crore is on grant basis with concession period of 22 years. The company has sought a grant of Rs 216 crore for the project from NHAI.

IRB Infra had submitted its bid with the authority for design, engineering, finance, construction, operation and maintenance of four lanning of Talegaon-Amravati section of NH 6 from Km 100.000 to Km 166.725 in Maharashtra under NHDP Phase III on a BOT basis.

Also See:

IRB Infrastructure lowest bidder for Rajasthan highway project (23-Jun-09)

Related Links:
Project profile

Addendum:

IRB Infrastructure Developers has bagged an order worth Rs 800 crore from the NHAI for the Talegaon Amravati Project.

New Password
Confirm Password