The National Highways Authority of India (NHAI) has floated tender for four-laning of Mohol-Alandi section.
The scope of work envisages four-laning of existing two-laning stretch from Dharmapuri at 117.000 km to Lonand at 166.400 km (Package-IV) on Mohol-Alandi section (design length - 49.400 km) of NH-965 in the state of Maharashtra on EPC mode.
The work will be completed in a period of 24 months at a cost of Rs 798.43 crore.