Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

NHAI invites bids for six-lane access controlled highway

Tuesday, 19 Mar 2019
Share this on :

The National Highways Authority of India (NHAI) has three separate invited bids for six-lane access controlled highway on hybrid annuity mode (HAM) under Bharatmala Pariyojana.

The scope of work involves construction of six-lane access-controlled highway from DND Maharani Bagh to Junction with Jaitpur-Pushta Road Section of NH-148NA (design ch 0.000 to 9.000) in the National Capital Territory of Delhi. The estimated value of the project is Rs 1,838.3 crore.

Construction of six-lane access-controlled highway from Junction with Jaitpur-Pushta Road to Junction with Sector-62/65 dividing road on Faridabad-Ballabhgarh Bypass Section of NH-148NA (design ch 9.000 to 33.000), including spur from design ch 13.200 to Junction of Faridabad-Ballabhgarh Bypass with NH-48 near Badarpur Border in the state of Haryana. The estimated value of the project is Rs 1,545.8 crore.

Construction of six-lane access-controlled highway from Junction with Sector-62/65 dividing road on Faridabad-Ballabhgarh Bypass to Junction near KMP Expressway with NH-148N (Delhi-Vadodara Expressway) Section of NH-148NA (design ch 33.000 to 59.063) in Haryana. The estimated value of the project is Rs 908.2 crore.

 

New Password
Confirm Password