Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

New Varappuzha bridge to ease traffic on Edappally-Moothakunnam NH-66 stretch

Thursday, 27 Nov 2025
Share this on :

A major relief for commuters, the first bridge along the 26-km Edappally-Moothakunnam stretch of NH 66, the new Varappuzha bridge, will open to traffic in the first week of December.

Spanning 1.03 km, the bridge was built in just 604 days at a cost of Rs 100 crore by Oriental Structural Engineers. It incorporates modern safety features, including eight remotely-controlled PTZ cameras for surveillance. The bridge was designed using the balanced cantilever method due to its location over the Periyar River, requiring clearance for vessels. "The final approach work is progressing and will be opened to traffic from the first week of December," said a senior NHAI official.

The bridge features 26 spans, with the river portion including 83-mtrs. and 120-mtrs. spans, facilitating navigational traffic below. This marks a significant step toward easing the severe congestion on the stretch.

New Password
Confirm Password