Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Reliance Infra's two roads in Tamil Nadu operational

Saturday, 10 Oct 2009
Share this on :

Reliance Infrasturcure's two road projects worth Rs 760 crore in Tamil Nadu have been opened for traffic.

The Namakkal-Karur toll road and the Dindigul-Samayanallur toll road started toll collection from August and September 2009, respectively.

The Rs 344.77-crore Namakkal-Karur project falls on NH-7 between the proposed flyover at Namakkal and the start of Karur bypass totalling a length of 41.775 km. The Dindigul-Samayanallur project at a cost of Rs 412.26 crore also falls on NH-7, totalling a length of 53.025 km.

The Union Government, through the NHAI, had awarded the projects to Reliance Infrastructure in January 2006 with a concession period (tolling rights for 20 years, including construction period of 30 months). The project funded by the concessionaire plus grant from NHAI is on build, own and transfer basis.

New Password
Confirm Password