Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

HCC to construct elevated road corridor in Kolkata

Thursday, 17 Dec 2009
Share this on :

Hindustan Construction Company (HCC) bagged an order worth Rs 318 crore for from Kolkata Metropolitan Development Authority for constructing an elevated road corridor from Park Circus to EM Bypass near Parama Island in Kolkata.

The scope of work includes design and construction of the flyover, with installation of electrical and other works (including LT Feeder Pillar Boards and street line poles). HCC is expected to construct the four lane (part two-lane) 8.14 Km Flyover from Park Circus to Parama Island, which will continue up to EM Bypass to the north of Dhapa crossing on a turnkey basis.

The order also includes operational and maintenance work for two years from the date of completion of the project. The project is to be completed within 30 months.

Also See:

HCC secures order from Gujarat Water Infrastructure (21-Oct-09)

Related Links:
Project profile

New Password
Confirm Password