Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

PMRDA to upgrade Metro Line 3 road into cement-concrete corridor

Wednesday, 23 Jul 2025
Share this on :

The Pune Metropolitan Region Development Authority (PMRDA) has initiated a major infrastructure upgrade plan for the road running along Metro Line 3—from Maan (depot) in Hinjewadi to Shivajinagar.

The project aims to transform the 50-km stretch (25 km in each direction) into a durable cement-concrete (CC) road, complete with enhanced road-related infrastructure and public amenities. The plan includes parking lanes, bus bays, lay-bys, medians, utility ducts, pedestrian infrastructure, and beautification elements. Utility relocation and electrification work will be part of the development. 

According to Umesh Mallawat, Executive Engineer at PMRDA, tenders have been floated to appoint consultants responsible for preparing the detailed project report (DPR), managing the bid process, designing the layout, supervising construction, and offering post-construction support. 

The existing Metro Line 3 contractor will first make the stretch motorable before full-fledged road work begins. The initiative seeks to improve surface-level mobility along the elevated metro corridor and manage rising traffic demands. The pre-bid meeting is scheduled for 24 July, 2025.

The consultant will conduct detailed surveys, drainage planning, and inter-agency utility coordination. The four-month design phase is expected to significantly enhance last-mile connectivity and commuter convenience.

New Password
Confirm Password