Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Sadbhav Engineering emerges L1 bidder for Ahmedabad-Dholera Greenfield Alignment

Thursday, 13 Aug 2020
Share this on :
Sadbhav Engineering has been declared as the lowest (L1) bidder for two road sections of Ahmedabad-Dholera Greenfield Alignment by the National Highways Authority of India (NHAI) on engineering, procurement and construction (EPC) mode. 
 
The scope of work includes construction of four-lane expressway from Sardar Patel ring road to Sindhrej village of Ahmedabad district from 0.000 km to 22.000 km of Ahmedabad-Dholera Greenfield Alignment (NH-751) in the state of Gujarat under Bharatmala Pariyojana (Package-I). The company has quoted Rs 690.30 crore for the project. 
 
The work for the second section includes construction of four-lane expressway from Sindhrej village to Vejalka village of Ahmedabad district from 22.000 km to 48.520 km of NH-751 under BharatmalaPariyojana (Package-II). The company has quoted Rs 882 crore for the project. 
 
The construction period for each section is 24 months.

 

New Password
Confirm Password