Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Sembcorp Gayatri synchronises first unit of Krishnapatnam project

Monday, 30 May 2016
Share this on :

Sembcorp Gayatri Power (SGPL) (formerly NCC Power Projects), has synchronised the first 660 MW unit of its 1,320 MW power plant at Krishnapatnam in Nellore, Andhra Pradesh, to the grid.

The company owns and operates one of the two supercritical coal-fired power plants in the 2,640 MW Sembcorp Gayatri Power Complex in Krishnapatnam, in Andhra Pradesh’s SPSR Nellore district.

The first power plant, Thermal Powertech Corporation India, commenced commercial operations in September 2015, and is supplying power to Andhra Pradesh and Telangana. The second power plant is expected to be fully operational in the fourth quarter of 2016.
 

New Password
Confirm Password