Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Siemens secures order for Visakhapatnam Steel Plant

Monday, 30 Sep 2013
Share this on :

A consortium comprising Siemens AG and Siemens has secured an order from Rashtriya lspat Nigam (RINL), to modernise blast furnace No 2 at Visakhapatnam Steel Plant in Andhra Pradesh.

 

The contract value for Siemens is Rs 271 crore. The process of modernisation will boost the furnace's inner volume from 3,200 cu mtr to 3,820 cu mtr and production will increase from 1.7 million tpa to 2.5 million tpa.

 

Visakhapatnam Steel Plant is an integrated steelworks with an annual capacity of around 6.3 million tonne of crude iron. Modernization of the blast furnaces is part of an expansion project which is intended to boost annual pig iron production to 7.3 million tonne.

 

Vizag Steel currently operates three blast furnaces: two with an interior volume of 3,200 cu mtr, and one with an interior volume of 3,800 cu mtr. Blast furnace No 2 has a nominal annual capacity of 1.7 million tonne of crude iron.

New Password
Confirm Password