Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Sixty percent work completed on Kittur Irrigation Project

Wednesday, 21 Aug 2019
Share this on :
The Karnataka Neeravari Nigam is implementing Kittur Irrigation Scheme from Malaprabha River in Belagavi district of Karnataka on turnkey basis.

In March 2018, the implementing agency invited bids for survey, investigation, design, supply, installation, testing and commissioning of lift irrigation system, head works consisting of approach canal, and other works for Stage- I and-II of project to fill water to tanks including operation and maintenance for a period of five years after successful commissioning of the project.

As per the latest information available with Projects Today, around 60 percent work has been completed. The project worth Rs 195.99 crore is expected to be completed by December 2020.

New Password
Confirm Password