Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Telangana govt. announces plans for construction of ‘Ratan Tata Road’

Friday, 28 Feb 2025
Share this on :

Telangana government has unveiled plans for the Greenfield Radial Road, named Ratan Tata Road, linking the Tata Interchange at Raviryal on the Outer Ring Road (ORR) to the Regional Ring Road (RRR) at Amangal. The Rs 4,030 crore project aims to enhance connectivity and promote urban development.

Spanning 41.5 km, the expressway will traverse six mandals - Maheshwaram, Ibrahimpatnam, Kandukur, Yacharam, Kadthal, and Amangal, covering 14 villages in Rangareddy district. It will be built in two phases: Phase I, covering 19.2 km from ORR (Raviryal, Tata Interchange) to Meerkhanpet at Rs 1,665 crore, and Phase II, covering 22.3 km from Meerkhanpet to RRR at Amangal at Rs 2,365 crore.

The Hyderabad Metropolitan Development Authority (HMDA) and Hyderabad Growth Corridor (HGCL) will oversee the construction of the 100-mtrs.-wide access-controlled expressway. Initially designed as a six-lane (3+3) main carriageway, it will have provisions for future expansion to eight lanes.

A 20-mtrs.-wide central median has been allocated for a future metro or railway corridor in alignment with long-term urban mobility planning. The expressway will incorporate service roads, a greenbelt, cycle tracks, footpaths, and a utility corridor on both sides to support sustainable transport infrastructure. 

New Password
Confirm Password