Support: +91-22-61011756 / help@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Thermax Group bags order for captive combined heat and power plant

Monday, 02 Nov 2020
Share this on :
Thermax Group has bagged an order worth Rs 320 crore to set up a captive combined heat and power (CHP) plant on EPC basis for Assam Bio Refinery (ABRPL).

ABRPL is a joint venture of Numaligarh Refinery (NRL), Fortum and Chempolis.

ABRPL is developing India’s first bio-refinery to produce cellulosic ethanol from bamboo biomass. This co-generation plant includes two high-pressure boilers of 98.5 TPH capacity each, air pollution abatement equipment along  with steam turbine generator and other auxiliary systems to generate process steam and power simultaneously.

ABRPL is targeting a larger production of second generation (2G) ethanol in  India.

The CHP will utilise all wastes and byproducts such as biocoal, stillage cake, etc emanating from the bio-refinery during the bio-ethanol production process. It will also help reduce dependence on grid power.

The scope of supply includes design, engineering, manufacturing,   construction and commissioning of the CHP plant. The project is to be completed in 20 months.

 
Post Your Comments
 
 
   
 

 

 
  
Sign up to start your trial access

Are you...



REGISTER AND GET STARTER KIT ABSOLUTELY FREE!

Free access to Project News and Analysis

Project and Tender Alert in your mailbox

Explore the largest Database on Projects for free

Be part of Online Projects Community

User login
Start Exploring

Subscribe to any of our premium plans to

Access to complete information on 43000+ projects

Use our Notification service for instant update on projects and tenders

Closely monitor your opportunities with "WORKSPACE"

Use our online platform for promotions of your products and services