Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Waaree Energies commences trial production at India’s largest solar cell plant

Monday, 06 Jan 2025
Share this on :

Waaree Energies has commenced trial production at its 5.4 GW solar cell manufacturing facility in Chikhli, Gujarat. This milestone positions the facility as the largest advanced solar cell plant in India, establishing Waaree as a key player in the global clean energy ecosystem.

The plant exemplifies Waaree’s vision for backward integration within the solar energy value chain. By manufacturing solar cells domestically, Waaree aims to reduce dependency on imports, stabilise costs amidst global supply chain challenges, and enhance India's global competitiveness in renewable energy. The facility, designed for high-efficiency solar cell production, caters to increasing domestic demand. 

Whole-time Director & CEO of Waaree Energies, Dr. Amit Paithankar, stated, "The commencement of trial production at our solar cell manufacturing facility is indeed an achievement for us and a testament to India’s renewable energy aspirations. Our drive for backward integration is aligned with the nation’s goal of reducing dependence on imports, thereby creating a robust, self-reliant solar supply chain. This facility features our dedication to research-driven innovation, which ensures we deliver world-class products. Beyond technological advancements, this also fosters economic growth by creating significant employment opportunities and driving sustainability in the sector."

The Chikhli facility is a testament to Waaree's dedication to innovation, sustainability, and scalability in solar technology. The company has consistently invested in advanced research and development to push the boundaries of solar manufacturing excellence. This milestone not only reinforces Waaree’s leadership in India’s clean energy revolution but also bolsters the nation’s efforts toward a resilient and self-sufficient energy ecosystem globally. This achievement also aligns with India's broader renewable energy goals, enhancing economic growth by generating employment opportunities and fostering sustainability.

Waaree's commitment to integrating technological advancements with strategic foresight reflects its ambition to position India as a global powerhouse in renewable energy production.

New Password
Confirm Password