Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Work commences on Kharghar-Turbhe Tunnel Link Road

Tuesday, 17 Dec 2024
Share this on :

Work has commenced on the Rs 2,099-crore Kharghar-Turbhe Tunnel Link Road (KTLR) in Navi Mumbai, aimed at significantly reducing travel time and easing traffic congestion on Sion-Panvel highway.

The project, led by CIDCO with Rithwik Projects as the contractor, is expected to be completed by September 2028. The KTLR will reduce the current 40-minute journey between Turbhe and Kharghar to just 10 minutes. An official stated, “Motorists travelling to Navi Mumbai via the Sion-Panvel highway will be able to take the KTLR from Jui Nagar railway station, reducing their travel time by 30 minutes.”

The road will connect with the Atal Setu and the upcoming Navi Mumbai airport, enhancing regional connectivity within the Mumbai Metropolitan Region (MMR). The project involves a 1.8-km twin tunnel through Kharghar hill and a 3.4-km elevated viaduct. Starting at Turbhe and running alongside the Sion-Panvel highway to Juinagar railway station, the route will pass through two unidirectional tunnels, ending near Central Park junction in Kharghar.

Additionally, a 1.5-km elevated road will link Central Park with the Taloja Central Jail, and a subway will connect Central Park to a proposed international corporate park. The infrastructure will improve access to Kharghar, Taloja, industrial areas, and attractions like CIDCO’s golf course. Officials confirmed, “All regulatory protocols are being followed,” and the work is on track for completion in four years.

New Password
Confirm Password