Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Work on Eastern Peripheral Expressway begins

Thursday, 21 Jan 2016
Share this on :

Work on the Rs 5,763 crore Eastern Peripheral Expressway has commenced following the redressal of land acquisition issues. The government intends to build the expressway in 400 days.

The five contractors of the project are Sadbhav Engineering, Jai Prakash Associates, Ashoka Buildcon, Oriental Structural Engineers and Gayatri Projects.

NHAI has transferred Rs 1,530 crore for land compensation and of this Rs 1,335 crore has already been paid to people whose land were acquired.

The project work has been divided into six packages of 21 km stretch in Sonepat-Baghpat, 24.5 km stretch in Baghpat-Ghaziabad, 24.5 km stretch in Ghaziabad-GB Nagar, 22 km stretch in GN Nagar, 21 km stretch in GN Nagar-Faridabad and 22 km stretch in Faridabad-Palwal.

The project spans three states - Delhi, Haryana and Uttar Pradesh.

New Password
Confirm Password