Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Dilip Buildcon receives LoA for upgradation of NH-131A

Thursday, 10 Sep 2020
Share this on :
Dilip Buildcon (DBL) has received letter of acceptance (LoA) from the National Highways Authority of India (NHAI) for a new hybrid annuity mode (HAM) project in the state of Bihar. 
 
The scope of work involves construction and upgradation of NH-131A from 34.600 km (design ch 6.000) near Narenpur to 79.970 km (design ch 53.000) near Purnea to four-lane standard and from 79.970 km (design ch 53.000) to 82.000 km (design ch 55.000) near Purnea to two-lane standard with paved shoulders. 
 
The bid project cost is Rs 1,905 crore with completion period of 24 months. The operation period is 15 years from COD.
New Password
Confirm Password