Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

Jaipur-Kishangarh Expressway to be inaugurated

Monday, 23 May 2005
Share this on :

Prime Minister, Dr Manmohan Singh, is scheduled to inaugurate the Jaipur-Kishangarh expressway in Rajasthan on 23 May 2005.

The six-lane expressway has been developed on BOT basis by GVK International in consortium with a foreign partner. The 90-km expressway on NH-8 (km 273.500 near Jaipur to km 363.885 near Kishangarh) in Rajasthan is part of the Golden Quadrilateral project of National Highways Authority of India Ltd.

The expressway would be 90.385 km in length with three major and 16 minor bridges, 68 culverts, five flyovers and 17.225 km of service roads. The expressway is six-laned throughout with toll plazas at either ends.

The project costing Rs.614 crore was completed in 24 months, six months ahead of schedule. The Jaipur-Kishangarh project is India's first six-lane BOT toll road project.

New Password
Confirm Password