Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

IJM-Shapoorji Pallonji bags Rs.565 crore NHAI contract

Friday, 10 Mar 2006
Share this on :

On 28 February 2006, IJM Corporation in a 50:50 joint venture with Shapoorji Pallonji & Co., India received a letter of acceptance from National Highways Authority of India for the design, engineering, construction, development, finance, operation and maintenance of four laning, the existing two lane, from km.192.25 (near Ulundurpet) to km.285 (near Padalur) on NH-45 in Tamil Nadu on BOT (toll) basis. This is the first highway development project of Shapoorji Pallonji & Co. 

The salient features of the contract are:

Section: Ulundurpet-Padalur (NH-45)
State: Tamil Nadu
Project: NHDP-IIIA
Length: 92.75 km (km 192.25 to km 285.00)
Execution: BOT (Toll) model
Concessionaire: IJM-Shapoorji Pallonji joint venture
Cost: Rs.565 crore
Completion: 30 months
Concession period: 20 years, including construction time
Grant: Rs.40 crore 
Project profile: Click here

ProjectsToday adds: This highway stretch is part of Tindivanam-Trichy (NH-45) upgradation project that is being implemented on BOT basis, under three distinct packages. The above order represents Package B of the project. The BOT contract for Package C has been awarded. Package A is being awarded to GMR Infrastructure, although details are not yet available.

Also See:

Indu Projects bags Rs.320 crore NHAI contract (09-Mar-06)

New Password
Confirm Password