Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

BHEL wins order for NTPC's Dadri unit

Wednesday, 02 Aug 2006
Share this on :

Bharat Heavy Electricals, on 1 August 2006, secured a major contract from NTPC for setting up the first unit of 490 MW of the National Capital Thermal Power Project (Stage II) at Dadri in Uttar Pradesh. The project is slated for commissioning in fiscal 2009-10.

BHEL’s scope of work in the contract envisages manufacture, supply, erection, testing and commissioning of the main plant package for the 490 MW power project. The equipment for the project shall be supplied by BHEL’s Haridwar, Trichy, Ranipet, Hyderabad, Bangalore, Bhopal and Jhansi plants, while the company’s Power Sector – Northern Region will undertake the erection and commissioning of the equipment.

BHEL has earlier supplied and commissioned boilers and steam turbine generators for the 4x210 MW Stage 1 of the project. It was also associated with NTPC’s 817 MW combined cycle power project at the same location.

For NTPC, BHEL is currently executing contracts at:

  • Kahalgaon (1,500 MW) -- Bihar
  • Vindhyachal (1,000 MW) -- Madhya Pradesh
  • Talcher STPS (2,000 MW) -- Orissa
  • Sipat  (1,000 MW) -- Chhattisgarh
  • Feroze Gandhi Unchahar (210MW) -- Uttar Pradesh

For recent orders bagged by BHEL, click here.

New Password
Confirm Password