Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

HCC bagged BOT contract from NHAI

Tuesday, 01 Jul 2008
Share this on :

Hindustan Construction Company (HCC) has bagged an order from National Highway Authority of India (NHAI) to construct the 4.4 km elevated six lane highway at Badarpur on NH 2 (Mathura Road) near Delhi on BOT basis.

The Rs.340 crore worth contract envisages design, construction, development, finance, operation and maintenance of 4.4 km of six lane elevated highway for a concession period of 20 years including construction period of 24 months. NHAI has already issued the letter of award for the project.

The elevated highway is expected to provide a much desired relief to inter-state movement on Mathura Road. It will provide a smooth and non-stop drive to motorists in Delhi and Faridabad, Haryana. It will start close to NTPC near Badarpur in Delhi and will end at Sector 37 in Faridabad.

Related Links:
Project profile

New Password
Confirm Password