Gayatri-Ratna Joint
Venture, a 80:20 JV between Gayatri Projects and Ratna Infrastructure Projects
has bagged two orders worth Rs.2,131.62 crore from the Andhra Pradesh
government.
The first order is
worth Rs.1,360.26 crore for constructing 182 km-206 km tail pond link canal from
near Tirumalagiri on NH-9 upto the road connecting Malkapatnam and the second
order valued at Rs.771.36 crore is for tail pond link canal from 206 km to 244
km, from Malkapatnam and Salakanoor and Salakanoor up to Halia river near
Ibrahimpet in package No.8 and package No.9 in Dummugudem - Nagarjuna Sagar
project. The entire works have to be executed within a span of 54 months.
Related Links:
Project profile