Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

BHEL bags order for Vallur thermal power project

Saturday, 12 Sep 2009
Share this on :

BHEL has bagged an order worth Rs 1,300 crore from NTPC-Tamil Nadu Energy Company Ltd (NTECL) for the supply and installation of the boiler, turbine and generator (BTG) package as an extension of its upcoming Vallur thermal power project at Ennore in Tamil Nadu, involving one unit of 500 MW. NTECL is a JV company of NTPC and Tamil Nadu Electricity Board.

BHEL's scope of work in the present order includes design, engineering, manufacture, supply, erection and commissioning of steam turbine, generator, boiler and associated auxiliaries, besides state-of-the-art controls and instrumentation system.

The company is already executing a contract for the 2x500 MW greenfield Vallur power project of NTECL.

Also See:

BHEL bags order from Indian Railways (11-Sep-09)

Related Links:
Project profile

New Password
Confirm Password