Reach us: 7304553123 / mktg@projectstoday.com
Help
1. Boolean Searches :

i. AND - Shows results where both terms on either side of the 'AND' operator are present. 'AND' must be in upper case. For example search term - delhi AND metro result - It will return records in which 'delhi' as well as 'metro' both are present.

ii. OR - Shows results where either term (or both terms) is present. 'OR' must be in upper case. For example search term - delhi OR metro result - It will return records in which either 'delhi' or 'metro' or both are present

2. Proximity Searches

A proximity search looks for terms that are within a specific distance from one another. For example, search term - 'delhi metro'~10 result - It will search for records where 'delhi' and 'metro' are found within 10 words of each other

3. Phrase searches

You can search phrases using double quotes. for e.g. 'delhi metro' result - It will return records where 'delhi metro' phrase is found.

75 percent completion achieved for Bhuj Railway Station redevelopment under Amrit Bharat Scheme

Tuesday, 11 Nov 2025
Share this on :

The redevelopment of Bhuj railway station under the Amrit Bharat Station Scheme has reached 75 percent completion.

This Rs 180-crore project, part of a nationwide plan to modernise 1,275 stations, features a design inspired by the Rann of Kutch. The station, slated for completion by April 2026, will have modern facilities including 13 lifts, 10 escalators, underground parking for 480 vehicles, and electric vehicle charging stations. Other key features include a 500 KWP solar power plant, rainwater harvesting, and a sewage treatment plant.

Additionally, the station will have a 3,240 sq. mtrs. concourse, improved passenger flow systems, and eco-friendly elements like a 250-tonne HVAC system. This upgrade aligns with regional connectivity plans, boosting tourism and trade in the area.

New Password
Confirm Password